• Summary Report of the 515th RSK Meeting

    This meeting was held as a web conference due to the impact of the Corona pandemic. In the meantime, the RSK had discussed the impacts of the pandemic on the operation and planned overall maintenance inspections of the nuclear power plants among the CORONA ad-hoc working group. The RSK discussed and adopted the statement "Statement on pending safety issues with regard to fuel assembly deformation in German pressurised water reactors (PWRs)".

  • Kurzbericht von der 516. RSK-Sitzung

    Die RSK wurde u. a. zu folgenden Themen informiert:

    Kernbeladungen und Inspektionen in den noch in Betrieb befindlichen Anlagen
    Netzstabilitäten und Rückwirkungen auf die Kernkraftwerke
    Wirbelstrombefunde an BE-Steuerelementen
    Dampferzeugerheizrohrbefunde in GKN-II
    Leistungsexkursionen bei Steuerstabtests vor dem Wiederanfahren der südkoreanischen Anlage Hanbit-1

  • Kurzbericht von der 518. RSK-Sitzung

    Die RSK wurde über die Beratung des ME 20/002 (F) „Überschreitung des Jahresgenehmigungswertes für die Ableitung des Nuklids C-14“ im Forschungsreaktor FRM-II vom 14.05.2020 im Ausschuss Reaktorbetrieb und den Sachstand in der AG Simulierstifte informiert.

    Die "Stellungnahme zu Anforderungen an die Kühlung der Brennelemente im Lagerbecken im Restbetrieb" wurde beraten und verabschiedet.

  • Kurzbericht von der 519. RSK-Sitzung

    Die RSK wurde u.a. zum Fortgang der Beratungen des ME 20/002 (F) „Überschreitung des Jahresgenehmigungswertes für die Ableitung des Nuklids C-14“ im Forschungsreaktor FRM-II vom 14.05.2020 und der Beratung des ME 18/058 „Lineare Anzeigen bei Wirbelstromprüfung von Dampferzeugerheizrohren“ in der Anlage GKN-II (09.09.2018) im Ausschuss Reaktorbetrieb informiert.

  • Summary Report of the 516th RSK Meeting

    The RSK was informed about the following topics, among others:

    core loadings and inspections in the facilities still in operation,
    grid stability and retroactive effects on the nuclear power plants,
    eddy current findings on FA control elements,
    steam generator tube findings in GKN-II, and
    power excursions during control rod tests prior to the restart of the South Korean plant Hanbit-1.

  • Summary Report of the 518th RSK Meeting

    The RSK was informed about the consultation on reportable event ME 20/002 (F) "Annual licenced value for the discharge of the nuclide C-14 exceeded" at the FRM-II research reactor of 14 May 2020 in the Committee on REACTOR OPERATION (RB) and about the state of affairs in the working group on simulation pins.

    The statement on requirements for the cooling of the fuel assemblies in the spent fuel pool during residual operation (Stellungnahme zu Anforderungen ab die Kühlung der Brennelemente im Lagerbecken im Restbetrieb) was discussed and adopted.

  • Summary Report of the 519th RSK Meeting

    The RSK was informed, among other things, about the progress of the consultations on reportable event ME 20/002 (F) "Annual licenced value for the discharge of the nuclide C-14 exceeded" at the FRM-II research reactor of 14 May 2020 and the consultations on reportable event ME 18/058 "Linear indications during eddy current testing of steam generator tubes" at the GKN-II nuclear power plant (9 September 2018) in the Committee on REACTOR OPERATION (RB).