• Summary Report of the 500th RSK Meeting

    After having heard the Reactor Safety Commission (RSK), the BMUB once again appointed Mr. Rudolf Wieland as Chairman and Mr. Richard Donderer – in absentia – as Vice Chairman of the RSK. The RSK was informed about errors in the manufacturing of cladding tubes "Shift in UT Data Recording" and the request of the KTA to continue the KTA work until the termination of the power operation of the German nuclear power plants and the continuation of the work of the KTA beyond 2022.

  • Summary Report of the 501st RSK Meeting

    The BMUB presented the request for advice on spent fuel pool cooling during plant decommissioning. The consultations are to be carried out by the RSK Committee on PLANT AND SYSTEMS ENGINEERING (AST). The RSK was informed about the German-Belgian expert meeting on the topic of RPV in Doel-3/Tihange-2 on 02.02.2018 and continued its consultation on the statement on component cooling water and service water systems (Zwischen- und Nebenkühlwassersysteme).

  • Kurzbericht von der 502. RSK-Sitzung

    Die RSK wurde über den Beratungsstand zu den "Erhöhten Oxidschichtdicken im oberen Bereich von Brennelementen mit M5-Hüllrohren" informiert, der bisherige Stand der entsprechenden Stellungnahme wurde beraten.  Aus dem Ausschuss ELEKTRISCHE EINRICHTUNGEN wurde zu den Beratungsthemen "Prüfumfang von RSP-Baugruppen" und "Betriebsbegleitender Nachweis der Kühlmittelverlust-Störfallfestigkeit von Komponenten der Elektro- und Leittechnik; Umsetzung der Anforderungen der KTA 3706" berichtet.

  • Kurzbericht von der 503. RSK-Sitzung

    Das BMU beglückwünschte die RSK zu ihrem 60jährigen Bestehen. Der Ausschuss ELEKTRISCHE EINRICHTUNGEN informierte die RSK über die "Herstellung der Eigenbedarfsversorgung innerhalb von 2 Stunden bei einem großflächigen Netzausfall; Zuordnung schwarzstartfähiger Kraftwerke – Kernkraftwerke". Die RSK beriet und verabschiedete die Stellungnahme "Ultraschallanzeigen am Reaktordruckbehälter der belgischen Kernkraftwerke Doel-3 und Tihange-2".

  • Summary Report of the 503rd RSK Meeting

    The BMU congratulated the RSK on its 60th anniversary. The Committee on ELECTRIC INSTALLATIONS (EE) informed the RSK about the establishment of auxiliary power supply within 2 hours in case of an extensive loss of offsite power, allocation of black-start-capable power plants – nuclear power plants (Herstellung der Eigenbedarfsversorgung innerhalb von 2 Stunden bei einem großflächigen Netzausfall; Zuordnung schwarzstartfähiger Kraftwerke – Kernkraftwerke).

  • Kurzbericht von der 504. RSK-Sitzung

    Die RSK beriet die Stellungnahmen "Auffälligkeiten bei der Durchführung von WKP/Nichtbeachtung von Regelungen in der Anlage KKP - Befassung mit diesen und ähnlichen Ereignissen" und "Zwischen- und Nebenkühlsysteme". Die Beratungen werden auf späteren Sitzungen fortgesetzt. Die RSK nahm einen Bericht des Ausschusses DKW zu "Anomalien an Schmiedestücken - Übertragbarkeit auf dee Anlagen" zu Kenntnis.

  • Kurzbericht von der 505. RSK-Sitzung

    Die RSK diskutierte über die Erfahrungen mit der RSK-Stellungnahme zu den belgischen Kernkraftwerken Doel-3 und Tihange-2 sowie über die zukünftige Rolle und Aufgabe der RSK nach 2022. Die RSK wurde über die Vorkommnisse "Abgescherte und verbogene Bolzen an Halterungen von Lüftungskanälen", "Befunde bei  Wirbelstromprüfungen an Dampferzeuger-Heizrohren im Kernkraftwerk Neckarwestheim" sowie einer Reaktorschnellabschaltung im niederländischen Kernkraftwerk Borssele informiert. Die Beratung der Stellungnahme "Zwischen- und Nebenkühlsysteme" wurde fortgesetzt.

  • Kurzbericht von der 506. RSK-Sitzung

    Die RSK wurde vom Ausschuss DKW über die ersten Beratungsergebnisse zu "Befunde bei Wirbelstromprüfungen an Damperzeuger-Heizrohren in GKN II" informiert. Die Beratungen zur Stellungnahme "Zwischen- und Nebenkühlsysteme" wurden fortgesetzt. Die RSK begann mit der Beratung der Stellungnahme "Anforderungen an die Nachweisführung zur passiven Kühlung von Brennelementen im Lagerbecken" des Auschusses AST.